Introducing of a compressed syllabus for training of probationers in the signal Engineering Department. Question of reducing the period of training of probationers in the Signal Engineering Depatt. as an emergency measure from 24 months to 12 months and compressing their training within that period. Not agreed to, But inshead the syllabus circulated vide letter No. E(GR)57RC16-6 dated 17-2-58 was revised presicibing both the phases of training at the staff college Baroda to be completed within the 2 years time

Keywords V.P. Sawhney
Bombay
Ministry/ Department/ Residency Ministry of Railway
Branch Establishment Gazetted Recruitment
From Year / Date
(YYYY-MM-DD)
1957
To Year / Date
(YYYY-MM-DD)
1957
Identifier PR_211200057521
File No./Reference No./Sheet No./Folio No. E/GR/57RC16-1/1-17
Location Repository-4
File Size 35.2 MB
Pages 51
Collection Digitized Public Records
Ministry of Railway
Language English
    11 views

Other Similar Items